Sign In | Join Free | My chinacomputerparts.com |
|
Brand Name : RUIHUI
Certification : CE, ISO certification
Place of Origin : Guangdong, China (Mainland)
MOQ : 1 Set
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 30 Sets Per Month
Delivery Time : 30 work days
Packaging Details : Wooden Box or Vacuum Packing
Stock Width(mm) : 70-1000
Stock Thickness(mm) : 0.6-6.0
Line Speed(m/min) : 16~24
Coil Weight(Kg) : 7000
Work Roll Number(Pcs) : upper 6/lower 5
Main Motor(Kw) : AC 11.0
Warranty Period : 12 Months
Max.Coil O.D.(mm) : 1400
Coil I.D.(mm) : 508
Feed Length(mm) : ~500*
Mandrel Expansion : Hydrauilc
Reel Motor(kw) : 2.2
Operating Air(Mpa) : 0.49
Double Head Material Frame Decoiler And Straightener Servo Feeder Automation Equipment
The double-head material frame replaces the traditional single-head material frame, and has two operation stations. One operation station of the material frame can feed the machine head of another operation station while discharging and unwinding work.
When the unwinding station material is used up, the material rack can be rotated 180 degrees in situ to quickly exchange the operation stations, which greatly improves the single machine working efficiency, realizes the uninterrupted operation of the high-speed stamping production line, saves materials and improves production. The advantage of efficiency.
In actual use, when the pre-punched toothed strip material of the high-speed punching machine is fed into the feeding groove formed by the double-head material frame guiding the upper side plate, the supporting material plate and the guiding lower side plate in the outward direction of the tooth, The thickness of the appropriate tray is selected so that the toothed strip remains flat after passing through the feed slot.
When entering the winding process, a driving pin in front of the tangential position is inserted into the material frame groove of the material in advance, the rack motor is started, the strip material is pulled forward, and then the driving pins are sequentially on the inclined surface of the protruding cam. Under the action, the toothed strip is inserted and driven to form a forming motion forward.
When the strip-formed strip reaches the winding outlet, under the action of the spiral surface of the vane cam, the winding device is led out and coiled on the material frame mandrel to become a rolled core piece; at this time, the material frame driving pin is guided The combination of the cam and the spring acts to unload the pin, which makes the winding operation continuous and improves the working efficiency.
Ruihui double-head material frame is reliable in forming, which can ensure the smoothness of the toothed strip and smooth movement of the strip. Since the diameter of the tray is larger than the inner diameter of the core forming structure, it can effectively prevent the driving pin and the toothed strip during the winding process. The interference between them is the most practical material discharging and unwinding equipment in the manufacturing process of the fixed rotor.
products:
specifications
Model | Stock Width (mm) | Coil Weight (kg) | Motor (kw) | Pressing Arm | Coiling block expansion mode | Material ID (mm) | Material OD (mm) |
ME-200 | 70-200 | 500 | 0.375 | Pneumatic | Manual/Hydraulic | 508 | 930 |
ME-300 | 70-300 | 800 | 0.75 | Pneumatic | Manual | 508 | 930 |
ME-400 | 70-400 | 1000 | 0.75 | Pneumatic | Manual/Hydraulic | 508 | 930 |
ME-500 | 70-500 | 1500 | 1.5 | Pneumatic | Manual | 508 | 1200 |
ME-600 | 100-600 | 3000 | 1.5 | Pneumatic | Manual | 508 | 1200 |
ME-800 | 100-800 | 5000 | 2.2 | Pneumatic | Manual | 508 | 1200 |
![]() |
Double Head Material Frame Decoiler And Straightener Servo Feeder Automation Equipment Images |